Category: Brand Journal

FATAZEN editorial stories about thoughtful personal-care routines, brand principles and everyday self-care.

  • Sample Approval: What to Check Before You Sign Off on Cosmetics

    A pre-production sample is a decision point, not a preview. The signature you put on it usually becomes the standard every later batch is measured against, so it is worth knowing exactly what the sample in your hand can and cannot tell you.

    What the sample is for

    The sample exists to confirm that the brief was read correctly: the format, the fill weight, the colour, the scent direction, the pack component and the label position. It is a check on interpretation, not a guarantee of production quality.

    This distinction matters because a sample is normally made in small quantity, sometimes by hand, in a lab rather than on the filling line. What it proves is that the formula and the pack exist as described. What it does not prove is that a 500-piece run will look identical.

    What you can judge in the room

    Four things are genuinely judgeable by hand, and all four should be written down rather than remembered.

    Appearance. Colour against the approved reference, opacity, and whether the surface is smooth or shows air bubbles. If colour is critical, keep a physical reference rather than a photograph, because monitors and phone cameras shift tone.

    Texture. How it leaves the container, how it spreads, whether it feels heavier or lighter than the version you approved verbally. Texture is where most revisions start, because words like rich and light mean different things to different people.

    Scent. Judge it twice: straight from the container and after it has sat on skin for a few minutes, since the top note is not the whole fragrance.

    Pack and fit. Whether the pump primes without priming instructions, whether the cap seats, whether the label sits straight and covers the seams it is meant to cover, and whether the fill line is where you expected it.

    What the sample cannot tell you

    Stability, compatibility and microbial results are not visible in a sample. They come from testing that runs on its own clock, and a sample approved before those results exist is approved on appearance alone.

    Compatibility is the one buyers most often skip: a formula can be perfectly stable in its own jar and still discolour or soften when it sits against a particular liner, gasket or pump elastomer. If the pack is custom, ask which compatibility work has been done on that specific combination.

    Production variance is the other blind spot. A lab sample and a production batch differ in mixing scale, filling temperature and dwell time. A sensible approval states a tolerance rather than an exact match, so that a small shade or viscosity difference in the first production run is a pass, not a dispute.

    Keep a counter-sample

    Ask for a second, sealed unit from the same sample batch and store it. Label it with the date, the sample reference and the version number of the artwork it was made against. When the first production batch arrives and someone asks whether the colour has shifted, the counter-sample answers the question in a minute instead of a week of email.

    Write the approval down

    An approval that exists only in a chat thread is not an approval. The useful version is one page: what was approved, the sample reference, the date, the artwork revision, the tolerance accepted, and the name of the person who signed. Send it back to the factory so both sides hold the same page.

    If you approve with conditions, list them separately. A conditional approval that is written as a plain approval is how deviations get discovered at the warehouse rather than at the sample stage.

    How the sample fits the timeline

    At FATAZEN the standard line runs on 500 pieces per SKU with a 25-day preparation window from confirmed deposit and approved artwork, FOB Guangzhou. Sampling happens before that window starts, which is why an artwork file that arrives late moves the ship date more than any production issue will.

    If the pack is stock, the sample round is short. If the pack is custom, the mould and its own sampling round sit outside the 25 days and need to be planned as a separate block. Buyers who plan the two together are the ones who are not surprised in the last week.

    A FATAZEN example of this in practice: FATAZEN Peach Comfort Cream — 200 g Jar for the Daily Routine.

    Related reading

    Private label programme — how a custom run is quoted and scheduled. Wholesale FAQ — minimums, documents and terms in one place. Our factory — filling, packing and the lines the samples come from.

  • How to Write a Private Label Brief a Factory Can Quote First Time

    Most first enquiries to a private label factory fail for the same reason: the brief describes an outcome (“a premium gel cream for the European market”) and asks for a price. A factory cannot price an outcome. It prices grams of formula, millilitres of fill, units of packaging, and the labour to assemble them. This article sets out the fields that turn an enquiry into a quotable brief, in the order a factory actually reads them.

    A brief is a quotation input, not a wish list

    When a factory receives a brief, someone has to decide four things: which existing formula is the closest match, which components can be bought at the stated volume, how much filling and assembly time the run needs, and what documentation the destination market requires. Every field below exists to answer one of those four questions.

    The seven fields to fill before sending

    Written in this order, a single page is usually enough:

    1. Product type and format — for example a rinse-off gel cleanser, a leave-on cream, or an anhydrous balm. Format determines the filling line, not the marketing story.
    2. Target fill weight or volume — 50 ml, 100 g, and the tolerance you will accept.
    3. Formula source — either a reference product the factory should match, or your own formula, or a request for the factory’s stock options in that category. State which one, because they carry different development time.
    4. Order quantity for the first run, and the annual volume you expect afterwards. These are two different numbers and both affect pricing.
    5. Packaging — component type, material, and who supplies it. Stock component, custom mould, or client-supplied are three separate cost paths.
    6. Destination market — the country of sale determines labelling, language, and which documents the shipment needs.
    7. Documentation required — COA, SDS, INCI list, composition breakdown, and any market-specific file. Ask for the full list in the first message; discovering it at shipment is the most common cause of delay.

    Describe the formula by phase, not by adjective

    “Lightweight but rich” is not a specification. A formulator can work with a phase structure: water phase, oil phase, emulsifier system, thickener, preservative system, and the functional ingredients you want present with a percentage range. If you do not have percentages, say what the reference product feels like and let the factory propose — but be explicit that you are asking for a proposal, because a proposal takes longer than a quote and the two should not be confused when you compare timelines.

    Packaging is usually the longer lead item

    Formula at our facility can be produced within a 25-day window for a confirmed first order. Packaging rarely moves that fast when it is custom: mould opening, sampling, and decoration each add their own queue. If your launch date is fixed, the practical sequence is to choose a stock component first and treat custom decoration as a later upgrade. State in the brief whether the component is stock, custom, or supplied by you, and whether artwork is print-ready.

    What a 500-piece minimum actually covers

    Our stated minimum is 500 pieces per SKU. That number covers a single formula in a single fill size in a single component. It does not cover two fragrances of the same base, and it does not cover the same formula in two fill sizes. If your range needs variants, list them separately in the brief so the factory can quote each line and tell you which ones can share a production run. A brief that hides variants produces a quote that has to be rebuilt later, which costs more time than listing them up front.

    Put the label decision in the brief, not after it

    Who writes the label copy, who checks the ingredient declaration order, and who approves the artwork? Factories in our position can print and apply a label; we cannot decide what a market regulator will accept on it. Say who holds that responsibility, and whether the artwork arrives as a dieline-ready file. Artwork arriving late is the single most common reason a confirmed order misses its ship date, because filling cannot start without a labelled component decision.

    Name the tests you want before production

    Compatibility between formula and component, stability under accelerated conditions, and micro testing are the three that most often get requested. Each has a duration. If they are not in the first brief, they will be added later and the timeline will move. If you need them, put them in writing with the acceptance criteria you will use, so the result can be checked rather than discussed.

    What you should get back, and in what form

    A usable reply contains: unit price at your stated quantity, the price break for the annual volume, the ex-works or FOB terms and the named port, the lead time counted from deposit and artwork approval rather than from the enquiry date, the MOQ per line, and the document list the factory will provide. If any of those six is missing, the quote is not comparable with another factory’s quote, and comparing them anyway is how buyers end up choosing on the wrong number.

    The brief that gets a fast answer

    One page, seven fields, no adjectives, variants listed separately, and a named decision-maker for artwork. That is the whole method. It is not a better-written document than a brand deck; it is simply the document a factory can price without asking you six follow-up questions first.

    Related

    Ready to price a run? Send the seven fields to our team through the private label page, or read the wholesale FAQ for terms, and see how the factory is set up before you ask for a quote. Distributors working across several markets can start from the distributor programme.

    What a first order actually draws from is easier to see on the face range, where formats and pack sizes are listed per product.

    A FATAZEN brief that came out of this structure is the Peach Blossom Shower and Bath Gel, 500 ml in a pump bottle.

  • Incoterms for Cosmetic Buyers: FOB, CFR, CIF and Landed Cost

    Two suppliers can quote the same product, the same quantity and the same production window, and still differ by a wide margin once you compare them properly — because the quotes may not include the same things. Incoterms exist to remove that ambiguity. They are four-letter rules that decide who pays for what, and at which point the goods stop being the seller’s problem.

    What an Incoterm does and does not decide

    An Incoterm fixes three things: where the seller hands over the goods, who arranges and pays for carriage, and where risk moves from seller to buyer. It does not fix the price of the goods, the payment terms, the quality standard or the Incoterms version used. Those belong in the contract. Always state the version — Incoterms 2020 is the current set — because the same three letters carry slightly different obligations across editions.

    EXW — ex works

    The seller makes the goods available at its own premises and does nothing more. You arrange export clearance, inland transport, sea or air freight, import clearance and final delivery. EXW looks cheapest on paper and is usually the most expensive in practice for a first order, because a buyer without a Chinese logistics partner has to assemble the whole chain alone: booking, container or LCL consolidation, export documentation, and a forwarder willing to collect from a factory address.

    EXW also puts export clearance on you, which is awkward when the seller is the party registered to declare. For a first order, most buyers are better served by a term where the seller handles the export side.

    FOB — free on board

    The seller clears the goods for export and delivers them on board the vessel you nominate at the named port. Risk passes at that point. You pay ocean freight and insurance from there. FOB Guangzhou is the term we quote on standard orders, which means the goods are cleared and loaded at the port, and everything after the vessel is your side of the ledger.

    FOB is the most transparent term for comparing suppliers, because it isolates the factory’s price from freight. If two quotes are both FOB the same port, the difference is the product. If one is FOB and one is CIF, the difference may be nothing but freight.

    CFR and CIF — cost and freight, cost insurance and freight

    Under CFR the seller pays the ocean freight to the named destination port; under CIF the seller also buys minimum-cover marine insurance. In both cases risk still passes when the goods are on board at origin, not when they arrive. That split surprises buyers: with CIF, if the cargo is damaged mid-voyage, the claim is yours to make against the insurer, not the seller’s to absorb.

    CIF is convenient when you do not yet have a forwarder. It is less convenient when you do, because you inherit the seller’s freight rate and routing rather than choosing your own.

    The comparison that actually matters: landed cost per unit

    A quote is only comparable at the landed stage. Build the number in four layers: goods value at the agreed term, freight and insurance to your port, import duty and taxes in your market, and inland delivery plus any handling at destination. Duty rates depend on the classification of the finished product in your country, not on the term, so the same shipment can price differently in two markets even with identical freight.

    The practical habit is to ask every supplier for the carton count, the gross weight per carton and the total volume, then price freight on those figures rather than on a per-unit estimate. Packaging decisions move this number more than people expect — see packaging options for a first order.

    Where the terms sit next to the other numbers

    Payment terms and Incoterms interact. A deposit-and-balance structure against a CIF shipment means you have paid in full before you can inspect at destination; the same structure on FOB with a forwarder you control at least lets you hold the bill of lading until the balance clears. Nothing about the four letters changes the payment risk — they only change the logistics.

    A short checklist before you accept a quote

    • Which Incoterm and which version, written in full with the named place or port.
    • What is excluded — export clearance, insurance, destination charges, unloading.
    • Carton count, gross weight and volume, so freight can be priced independently.
    • Whether the price is per SKU or blended across a range, and at which quantity tier.
    • What happens to the term if the order grows and moves from LCL to a full container.

    Common misreadings

    Three come up repeatedly. First, treating CIF as “delivered”: risk has already passed at origin. Second, assuming FOB includes loading at destination — it does not, and destination handling is often billed separately by the port or the forwarder. Third, comparing an EXW price with an FOB price directly, which is not a comparison of suppliers but of logistics arrangements.

    Where to go next

    Our standard terms — 500 pieces per SKU, a 25-day production window, FOB Guangzhou — are set out in the wholesale FAQ. If you are still shaping the order itself, start with MOQ and lead time, then read the cost structure of a private label run and the private label overview.

    Related

    A FATAZEN example of this in practice: FATAZEN Peach Blossom Shower and Bath Gel — Botanical Formula 500ml.

  • Selling Skincare in the UK After Brexit: SCPN and the Responsible Person

    Since the UK left the EU, a cosmetic sold in Great Britain follows a separate route from the same product sold in the EU. The formula does not change. The paperwork does. For a distributor planning a first shipment, the practical question is which entity carries the legal responsibility in each market, and where the notification sits.

    Two markets, two regimes

    Great Britain (England, Scotland and Wales) operates under the UK Cosmetics Regulation. The EU operates under Regulation (EC) No 1223/2009. They are closely aligned in substance, which is why the same formula usually satisfies both, but they are administered separately: separate notification databases, separate responsible person, separate enforcement authority.

    Northern Ireland is the exception. Under the Windsor Framework, cosmetic products placed on the Northern Ireland market follow EU rules, which means an EU responsible person and a notification on the EU portal rather than the UK one. A distributor shipping to the whole of the UK is therefore dealing with two regimes inside one country.

    The UK Responsible Person

    A business established outside the UK cannot place a cosmetic on the GB market on its own behalf. It appoints a UK Responsible Person: an entity established in the UK that accepts defined legal duties for the product. In practice the RP is named on the label and is the address an enforcement officer writes to.

    The duties are not nominal. The RP holds the Product Information File and must make it available to the authorities on request; it maintains the notification; it handles serious undesirable effects and cooperates on recalls; and it must be able to stop a product being placed on the market where the file does not support the claims. A distributor cannot simply lend its address to a supplier and consider the matter closed.

    SCPN: the notification step

    Before a product is placed on the GB market, it is notified through the Submit Cosmetic Product Notifications service, operated by the Office for Product Safety and Standards. The notification records the product identity, the responsible person, the formulation frame and the packaging, and it is submitted by or on behalf of the RP.

    Two points are commonly missed. First, the notification is per product, not per shipment; a new variant is a new notification. Second, notification is not an approval. Nobody reviews the file and issues a certificate. The system records that a notification exists, and compliance is assessed afterwards if a product is examined. A distributor asking a supplier for a “UK certificate” is asking for a document that does not exist.

    The Product Information File

    The PIF is the technical dossier that sits behind the product: the quantitative formula, the method of manufacture, the safety assessment, the evidence for any claims, and the packaging specification. It has to be kept for the period required after the last batch is placed on the market and it has to be in a form an authority can read without translation friction.

    A safety assessment signed by a qualified assessor is part of the file. This is the item most often missing when a distributor inherits a product from an overseas supplier, because the supplier may hold an assessment written for a different market or a different packaging format.

    What the label must carry in GB

    • The name and address of the UK Responsible Person, in addition to the manufacturer.
    • The nominal content at the time of packaging, and the batch identification.
    • The list of ingredients in descending order, with fragrance allergens declared where they exceed the threshold.
    • Any precautionary statements and the period after opening where relevant.
    • Country of origin where the product is imported into GB.

    Where the factory stops and the distributor starts

    A factory can supply the formula, the manufacturing record, the safety assessment it commissioned, the packaging specification and the artwork. A factory cannot appoint the UK Responsible Person, cannot hold the PIF on a distributor’s behalf unless it is established in the UK and accepts the role, and cannot notify the product on a distributor’s behalf without that appointment.

    That boundary is the single most useful thing to settle before a first order. It determines who is on the label, who answers the regulator, and who pays for the safety assessment when a variant is added later.

    Where to take this next

    Our private label programme sets out what a first order includes and which documents travel with it. The wholesale FAQ covers minimums and terms, the factory page shows the production and packing line, and the distributor page covers territory arrangements.

    Related reading: OEM vs ODM vs Private Label, MOQ and Lead Time: 500 Pieces, 25 Days, Packaging Options for a First Skincare Order.

    This page describes the regulatory structure in general terms for buyers planning a first shipment. It is not legal advice and does not replace the assessment of a qualified responsible person.

  • Selling Skincare in the EU: What a Distributor Must Hold Before the First Sale

    A non-EU brand can manufacture a compliant product and still be unable to sell it in Europe. The obstacle is rarely the formula — it is the paperwork chain that has to exist before the first unit is placed on the market, and the single legal person who has to stand behind it. For a distributor, this is the difference between a product they can list and a product they can only warehouse.

    The Responsible Person is the pivot

    Under the EU Cosmetics Regulation, every cosmetic product placed on the EU market must have a Responsible Person established inside the EU. That person is not a formality: they hold the product file, they answer to market surveillance authorities, and their name and address go on the label. If you are importing from outside the EU, the Responsible Person is the party who can be inspected — which means the role is either filled by you, by an EU-established entity acting for you, or by your supplier if they genuinely have an EU establishment.

    The mistake to avoid is assuming the factory abroad can be the Responsible Person. A manufacturer outside the EU cannot hold that role, regardless of how good their documentation is. Someone inside the EU has to take it on, and that someone needs the complete file, not a summary.

    What the file actually contains

    The Product Information File sits behind every compliant product and has to be assembled before notification, not after. In practice it holds the product description and intended use, the qualitative and quantitative formula, the manufacturing method and a statement of compliance with good manufacturing practice, safety data for the ingredients where required, the safety assessment report signed by a qualified safety assessor, and the evidence behind any claim made on the pack.

    Two items in that list are the usual delay points. The safety assessment is a signed professional opinion, not a lab test, and it needs the actual formula rather than a marketing name. The claim evidence has to match what is printed on the label — if the pack says something about the product’s performance, the file needs the basis for it, and the assessment needs to have considered it.

    Notification before the first sale

    Before a product goes on sale in the EU, it must be notified through the CPNP portal. The notification carries the product category, the Responsible Person’s details, the frame formula, the name and address of the manufacturer, and the label as it will appear. A distributor cannot notify a product without knowing who the Responsible Person is, because the portal requires it. This is why the sequence matters: appoint the Responsible Person first, then notify, then sell.

    What the factory supplies and what it cannot

    It is worth being explicit about the boundary, because buyers regularly expect the wrong half. A manufacturer outside the EU supplies the manufacturing-side record: the qualitative and quantitative formula, the batch record, the certificate of analysis for the batch, the GMP documentation for the site, and whatever ingredient safety data the formula requires. Those are the inputs to the file.

    What the factory cannot supply is the EU-side appointment, the CPNP notification in your name, the signed safety assessment issued for the EU regime, or the label as the Responsible Person will stand behind it. Those belong to the party inside the EU.

    The UK is a separate track

    Great Britain does not use CPNP. Products placed on the GB market need a UK Responsible Person and a notification through the UK portal instead, and the two systems do not read from each other. A product notified in the EU is not notified in GB, and the reverse is also true. Northern Ireland follows the EU route rather than the GB route.

    For a distributor holding both territories this doubles the notification work, but not the product work: the same batch, the same file and the same label base can serve both, provided the Responsible Person arrangements exist on each side.

    The label checklist that follows from all this

    Because the Responsible Person and the notification both reference the label, the label is where compliance becomes visible. The elements that have to be present and consistent: a product function and name that identify it clearly, the nominal content by weight or volume, the ingredient list in descending order with fragrance allergens declared where they exceed the threshold, the batch identification, the period after opening or the minimum durability date, any precautions, the country of origin where required, and the name and address of the EU Responsible Person.

    Ingredient naming is where non-EU suppliers most often fall short — a formula written in commercial terms has to be translated into INCI names before it can be assessed, notified or printed. If you want to read a formula as a buyer rather than as a chemist, how to read a skincare ingredient list covers that in detail.

    Practical sequence for a distributor

    Confirm the formula and get the full quantitative version before you commit to volume, because the safety assessment depends on it. Appoint the Responsible Person for each market, then notify, then print. Keep the file assembled and reachable for as long as the regulation requires after the last batch leaves the market — this is a retained record, not a one-off submission. And build the label from the compliance requirements rather than retrofitting compliance onto a design you have already approved, which is the single most expensive way to discover the gap.

    Our manufacturing terms are published rather than quoted per case: production from 500 pieces per SKU, 25 days preparation, FOB Guangzhou, samples quoted per SKU. For the commercial side start at the private label process, for the questions buyers ask most read the wholesale FAQ, and for territory rights see the distributor page. This article describes the regulatory structure in general terms for buyers planning a market entry; it is not legal advice, and the Responsible Person or a regulatory advisor should confirm the position for your specific product and territory.

    Related

    How to evaluate a skincare brand before you take on its line
    What a private label quote is actually made of
    How to read a skincare ingredient list as a buyer

  • Packaging Options for a First Skincare Order: Bottles, Tubes and Jars

    Packaging is usually the second decision a brand makes and the first one it regrets. The formula decides what the product does; the pack decides what the order costs, how much of it you must buy, and how the carton travels. This is a practical order of decisions for a first skincare run.

    Start from the formula, not the container

    A thin gel and a rich butter do not want the same pack. Before looking at shapes, settle three things about the formula: its viscosity, whether it contains volatile or oxidisable ingredients, and whether it needs protection from light. Those three answers rule out more options than any price list will.

    Water-thin toners and micellar waters generally want a bottle with a restricted orifice or a pump. Lotions and creams sit comfortably in tubes, jars or airless packs. Oils and serums suit droppers or small pumps. A butter or scrub wants a wide-mouth jar. Choosing against the formula is how brands end up with a pack that leaks in transit or will not dispense.

    The five formats most first orders use

    • Bottle with pump or disc-top. The default for cleansers, toners and body wash. Widely available, easy to fill, easy to replace. Watch the closure thread and the liner.
    • Tube. The most economical pack for creams and gels, and the lightest to ship per unit. Laminated tubes print well; extruded tubes suit simpler decoration.
    • Jar. Right for butters, scrubs and balms. Cheaper to fill than a pump pack, but heavier and more exposed to product contacting fingers.
    • Airless pump. Best protection for oxidation-sensitive formulas, and the most expensive of the five. Ask which refill sizes the factory already stocks before designing around it.
    • Dropper. Standard for serums and oils. Small, cheap to ship, but the glass and the pipette are two components to qualify, not one.

    What actually sets the minimum quantity

    The number to ask about is not ‘what is your MOQ’ but ‘what is the minimum for this pack, filled’. Three separate minimums can apply: the filled product minimum, the component minimum if the factory has to buy bottles or tubes specifically for you, and the decoration minimum if the pack needs printing. On a standard order at FATAZEN the figure is 500 pieces per SKU on a 25-day production window, FOB Guangzhou — and the practical question is whether your chosen pack sits inside those numbers or pushes them up.

    Where a print cylinder or a mould is involved, that setup is paid once per design and reused on every reorder. It is the reason a second order is cheaper per unit than the first, and the reason a design change mid-launch is expensive.

    Decoration is where budgets move

    Four decoration routes cover most first orders: a printed self-adhesive label, direct silk screen, hot stamping, and a printed shrink sleeve. A label is the cheapest to change and the easiest to keep compliant when a market requires different wording. Direct printing looks better on shelf but locks the artwork to a print setup. For a first order in more than one market, a label usually wins on flexibility even when it loses on appearance.

    Compatibility checks before you approve

    Pack and formula have to be tested together, not separately. Ask what was checked: liner and gasket material against the formula, pump mechanism against viscosity, print adhesion against the filling line, and drop resistance for the filled unit. A pack that passes on the bench and fails in a carton is a common first-order loss, and the check costs far less than the rework.

    Freight is decided by the pack

    Carton dimensions and gross weight per unit decide your landed cost more than the unit price does. Tubes stack densely; jars and glass droppers carry air and weight. Ask for the carton count and the gross weight before comparing quotations, because two suppliers quoting similar unit prices can differ substantially once freight is calculated per unit.

    A short checklist before you approve a pack

    • Formula viscosity and light sensitivity matched to pack type.
    • Filled minimum, component minimum and decoration minimum, all three written down.
    • Decoration route chosen with a second market in mind.
    • Compatibility and drop test results before mass production.
    • Carton dimensions and gross weight per unit confirmed for freight.

    Where to go next

    If you have not chosen a route yet, start with the private label overview and confirm the trade terms in the wholesale FAQ. The factory page sets out what the filling line runs, and the distributor programme covers what changes once you are ordering regularly.

    Related

    What a first order actually draws from is easier to see on the body range, where formats and pack sizes are listed per product.

    A FATAZEN example of the tube format is the Floral Hand Cream, printed directly on the tube; a jar example is the Arbutin Radiance Face Cream.

  • How to Read a Skincare Ingredient List (INCI) as a Buyer

    An INCI list is a regulatory disclosure, not a marketing document. For a buyer placing a first private label order, it is also the cheapest due-diligence tool available: it tells you what the formula is made of, roughly in what proportion, and whether the supplier’s specification matches what was quoted. This is how to read one without over-reading it.

    The order is the concentration, with one exception

    Ingredients are listed in descending order of concentration down to 1%. Above that threshold, position is meaningful: a serum whose second ingredient is glycerin is a different product from one where glycerin appears eighth. Below 1%, the list may be in any order, so the last ten lines of a long list carry no ranking information at all. Two suppliers can hand you visually identical lists that perform differently, because everything after the 1% line can be reshuffled freely.

    The 1% line is not a quality marker

    New buyers often assume that an active listed near the end is decorative. That is sometimes true and sometimes not, and the list alone will not tell you which. What the list does tell you is that you cannot use position alone to compare two formulas. If the difference matters commercially, ask for the percentage in writing and have it stated on the specification sheet attached to the quotation. A supplier who will not put a number in writing is telling you something useful.

    Fragrance, colour and preservatives sit where they sit

    Fragrance and colour are declared by function rather than by composition, which is why they appear as single entries. Their position tells you how much is present, not what is in them. Preservatives follow the same logic: a formula with phenoxyethanol high in the list is a formula built around phenoxyethanol, and that has consequences for the claims you can make and for markets with restricted lists. If you are selling into a regulated market, the preservative system is one of the first things a reviewer will check.

    Ask for the source document, not a screenshot

    The INCI on a product page is a copy. The authoritative version sits in the formula specification held by the filling factory, and it is the one that must match the label you print. Ask for the specification sheet and the certificate of analysis together, and check that the INCI strings are identical character for character. Discrepancies here are common and cheap to fix before printing, expensive to fix after.

    What to put in your own order documents

    Put four things in writing before the first production run: the full INCI string as it will appear on pack, the percentage of any ingredient you are paying a premium for, the allergen declaration for the fragrance, and the market the label is being written for. These four items are what a distributor will ask you for later, and what a customs or compliance reviewer will ask for at the border. Our own production terms are 500 pieces per SKU, 25 days preparation and FOB Guangzhou, so this documentation work happens inside that window rather than after it.

    Where this fits in the buying sequence

    Read the INCI after you have shortlisted a formula and before you approve artwork. It is not a screening tool for choosing a category; it is a verification tool for confirming that the sample you approved is the product you will receive 500 times. If you are still at the earlier stage, start with private label for the process and our factory for the production side, then use wholesale FAQ for the commercial terms that apply to first orders.

    Two places where lists diverge

    There are two documents that customers and buyers both call “the ingredient list”, and they are not the same. The pack label carries the INCI in a fixed legal order and wording. The specification sheet carries the same list plus percentages, suppliers and grade. When a distributor asks to see “the formula”, they usually mean the second one, and a supplier who only has the first cannot answer a regulatory question in a market that requires a product information file. Keep both, and keep the version that was approved attached to the purchase order.

    Related

    How to Vet a Skincare Manufacturer covers the factory-side checks that sit alongside this one. Skincare MOQ and Lead Time explains what 500 pieces and 25 days actually commit you to. Evaluating a Brand Before Signing is the next document question a distributor will raise.

    A FATAZEN product that prints its actives on the front label is the Antioxidant Glow Face Serum.

  • How to Evaluate a Skincare Brand Before Signing a Distribution Agreement

    Most distribution talks begin with the discount and end with the territory. The questions that decide whether the partnership still works in year two are usually asked last — often after signing. This checklist puts them in the order that protects the distributor.

    1. Start with capacity, not price

    Three numbers tell you more than any price list: the minimum order quantity per SKU, the lead time for a repeat order, and the Incoterms the brand actually quotes on. Take them in writing, and check whether they are stated per SKU or per order — a 500-piece minimum per SKU behaves very differently from 500 pieces across a mixed order when you are testing eight lines.

    At FATAZEN the standard terms are 500 pieces per SKU, a 25-day production window, and FOB Guangzhou. Those are the figures a distributor can plan a first container around, and they are stable enough to be written into an agreement.

    2. Ask which documents travel with the goods

    A batch certificate of analysis, a safety data sheet, the ingredient list in INCI order, and the certificate held by the filling site are the four documents buyers ask for most often. Ask to see a sample of each, not a promise that they exist.

    Then ask who is the responsible party for the markets you intend to sell into. Labelling obligations differ between the United States, the European Union and the United Kingdom, and the answer should name a role rather than a country. If a brand cannot say which markets it already ships to with complete paperwork, treat that as a gap to close before the first order, not a detail to sort out later.

    3. Settle label and intellectual property in writing

    Four items cause most disputes after launch: who owns the artwork file, who owns the barcode, who owns the mould or the print cylinder, and whether the brand can sell the same formula to another distributor in your territory under a different name. Get each one answered on paper. Exclusivity on paper is worth little if the identical product can appear beside yours under a second label.

    4. Define exclusivity with numbers

    Exclusive without a volume commitment is a marketing word. A workable clause sets an annual minimum in units, a review window — quarterly is common — a defined territory at country or state level, and a termination path if the minimum is missed two windows running. Ask what happens to your stock and to your listings if the agreement ends; the answer should be a buy-back or a sell-through period, not silence.

    5. Design the first order as a test

    A first order is a measurement, not a commitment. One carton per SKU is usually enough to test three things: sell-through in your channel, reorder rate from your own accounts, and the damage rate after a real freight leg. Track all three before you commit to a container. Distributors who skip this step end up holding depth in lines that never reordered.

    7. Price the landed cost, not the unit price

    A distributor margin is decided downstream of the quotation. Freight per carton, duty at your border, relabelling if the destination market needs it, and the cost of holding stock are all part of the number you are really paying. Ask for the carton dimensions and gross weight before you compare brands, because two suppliers quoting a similar unit price can differ by a third once freight is calculated per unit.

    Then ask what changes at the second order. A brand that can hold the same lead time across a repeat order is easier to plan than one that is fast on the sample and slow on the refill.

    6. Red flags worth walking away from

    • Quantities or lead times that change after the first quotation.
    • No sample of the batch documentation before an order.
    • Unwillingness to name a responsible party for your market.
    • Exclusivity offered verbally, with no volume attached.
    • Artwork or barcode ownership left unanswered.
    • Pressure to buy depth on an untested line.

    Where to take the conversation next

    If you are comparing brands, read how to vet a skincare manufacturer before a first order alongside this checklist, and use the MOQ and lead time explainer to test whether the numbers you were quoted are internally consistent.

    For our own terms, start with the distributor programme, check what the factory runs, and take open questions to the wholesale FAQ. If you are weighing private label instead of branded stock, the private label route sets out what changes.

  • Private Label Skincare Cost Structure: What You Are Actually Paying For

    A private label quotation for skincare rarely arrives as a single figure. It arrives as a unit price, which hides five separate cost lines stacked in a fixed order. Buyers who cannot see the stack tend to negotiate the wrong one — usually the bulk, which is often the smallest lever available to them.

    The five lines, in the order they occur

    Bulk, packaging, filling, artwork and testing. That is the sequence a product moves through, and each line has a different behaviour when volume changes. Bulk scales almost linearly. Packaging scales in steps, because cartons, tubes and jars are bought in fixed box counts. Filling sits between labour and machine time, and stops falling once a line is running at full speed. Artwork is close to fixed — plates, cylinders and colour proofs cost roughly the same at 500 pieces as at 5,000. Testing is a per-formula cost that does not move with quantity at all.

    The practical consequence: at 500 pieces, artwork and testing can be the two largest line items as a share of unit cost, even though they are the smallest in absolute money. At 5,000 pieces the same two lines become almost invisible, and bulk starts to dominate.

    Why the bulk line is smaller than buyers expect

    In a jarred cream, the formula is usually not the majority of the unit price. Primary packaging often costs more than the contents — a thick-walled jar, a dropper with a glass pipette, or a tube with a decorated cap can carry more cost than the bulk it holds. This is why “can you make the formula cheaper” frequently returns a smaller saving than “can we use a stock jar instead of a custom mould”.

    It is also why packaging decisions made early are expensive to reverse. A mould is tooling; tooling is amortised over the run. Change the mould after the artwork is approved and the artwork line has to be paid twice.

    Where MOQ actually bites

    Minimum order quantity is usually 500 pieces per SKU, and the minimum is per SKU rather than per order. Five SKUs is five minimums. That is the number that breaks a first budget — not the unit price of any one line.

    A common way to reduce exposure is to launch fewer SKUs with a wider packaging range, then extend once sell-through is known. The alternative — many SKUs at the minimum — spreads artwork and testing across more formulas without reducing their combined cost.

    There is a second reason the minimum is per SKU: traceability. Each formula is batched and recorded on its own, with its own bulk lot and its own fill record. Merge two SKUs into one run and the records no longer separate cleanly, which matters the moment a buyer asks for a certificate of analysis tied to a specific delivery.

    The 25-day window and what it does not include

    Twenty-five days is preparation before dispatch, FOB Guangzhou. It covers bulk manufacture, filling and packing. It does not cover sea freight, destination customs clearance, or the time a buyer spends approving artwork — and artwork approval is where first orders most often lose a week.

    Ask for the artwork proof before the deposit if the schedule is tight. The proof is the step that depends on you, not on the line.

    What to ask for instead of a discount

    Three questions expose the structure faster than a price negotiation. Which line is the largest share of this unit price? Which lines are fixed at this quantity? What changes at twice the volume? The answers tell you whether to renegotiate the formula, the pack, or the quantity — and only one of those is usually worth the effort at 500 pieces.

    Our own terms are published rather than quoted case by case: 500 pieces per SKU, 25 days preparation, FOB Guangzhou, samples quoted per SKU. Details are on the private label page, and the commercial questions buyers ask most often are collected in the wholesale FAQ. For the production side — lines, filling and packing — see our factory.

    Related

    If this is your first order, read OEM vs ODM vs Private Label for the difference between the three arrangements, How to Vet a Skincare Manufacturer for the documents to request, and MOQ and Lead Time for how the two numbers interact, and Packaging Options for a First Skincare Order for how the pack format itself moves the minimum.

    What a first order actually draws from is easier to see on the facial serum shelf, where formats and pack sizes are listed per product.

    A FATAZEN product you can use to walk through the cost build is the Papaya Facial Cleanser, a tube format with a single-fill run.

  • Skincare MOQ and Lead Time: What 500 Pieces and 25 Days Actually Mean

    Two numbers decide whether a first order is viable: the minimum quantity per SKU and the time between deposit and dispatch. Both get quoted constantly and both get misunderstood in the same way — as single figures rather than as consequences of the production line. A FATAZEN example quoted on this basis is the Antioxidant Face Serum.

    Why 500 pieces exists

    A fill line has a minimum run. Below a certain volume the cleaning, setup and changeover time costs more than the batch is worth, and the raw materials themselves are bought in drums and pails rather than by the kilogram. The result is a floor: most skincare SKUs are quoted from 500 pieces, a few lines start lower, and small packs or multi-step products sit higher.

    The floor is per SKU, not per order. That distinction is what breaks first-order budgets — five SKUs at 500 pieces is 2,500 units, and the cash sits in inventory long before it turns into revenue.

    How to fit a launch inside the floor

    Instead of cutting the quantity, cut the number of SKUs in the first run. One hero product at 500 pieces, sold through one channel, tells you more about demand than five products at 500 pieces each. The second order is where variety gets added, because by then you know which variant actually moves.

    Where a range is genuinely needed — a gift set, a three-shade line — ask whether variants can be split inside a single run rather than each carrying its own minimum. Some can, because the base formula is identical and only the pack or the fragrance changes. Some cannot, because the formula differs. The answer is product-specific and should come with the quote.

    What 25 days actually covers

    Preparation time is measured from artwork approval and deposit receipt. Inside that window sit material procurement, filling, labelling, cartoning and the pre-shipment check. It does not include sampling before the order, booking space, or transit — and it does not absorb artwork revisions made after the clock starts.

    A realistic first-order timeline therefore looks like this: sample and approve the formula, lock artwork, pay the deposit, then 25 days of production, then booking and transit on top. Buyers who plan only the 25 days are consistently late to their own launch date.

    The three costs that are not the unit price

    Label plates and setup — charged once, then effectively free on repeat orders, which is why the second order is always cheaper per unit than the first. Sample and courier — usually charged and usually credited against the order. Payment terms and freight — the term and the port change the total more than a small unit-price difference does.

    Reading a tiered quote

    Tiered pricing means the rate per piece falls as the quantity rises, and the tiers are not always published because they depend on the pack and the formula. What matters when comparing suppliers is the rate at your actual intended volume, not the rate at the headline minimum. Ask for the rate at the quantity you will order, and for the next tier up so you can see whether stepping up is worth the extra stock.

    Where the published figures sit

    FATAZEN quotes most lines from 500 pieces per SKU, with preparation time of 25 days measured from artwork and deposit, and ships FOB, CFR, CIF or EXW from Guangzhou Port. Those figures are stated on the wholesale FAQ and repeated on every quotation. The manufacturing base behind them is on our factory, and brand-own production is described on private label.

    If you are comparing several suppliers at once, the quotation checklist lists the fields to put side by side before deciding.

    Related: OEM vs ODM vs private label and how to vet a manufacturer before a first order. Pack formats are covered in Packaging Options for a First Skincare Order.