Most first orders go wrong before production starts — at the point where a buyer accepts a sample, a certificate and a lead time without checking whether any of the three applies to the product they are actually buying. This is the sequence that catches it.
1. Confirm the business licence covers cosmetics production
A trading company can sell cosmetics. Only a licensed manufacturer can make them. Ask for the business licence and read the permitted scope, not the company name. Where the licence scope and the product category do not line up, the production is being subcontracted, which changes who is accountable for the batch.
2. Read the GMP certificate, do not photograph it
A cosmetics GMP certificate — commonly issued against ISO 22716 — has a certificate number, a named holder, an address, a scope and an expiry date. Four things to check: the holder name matches the entity you are contracting with, the address matches the site you expect, the scope covers the category you are ordering, and the expiry has not passed. A scanned certificate with the number cropped out is not evidence of anything.
3. Ask what “FDA approved” means, because for cosmetics it means nothing
The US FDA does not approve cosmetic products or cosmetic manufacturing facilities. What exists is facility registration and product listing under MoCRA, plus a prohibition on adulterated or misbranded product. A supplier who says “FDA approved cosmetics” is either repeating a sales line or does not know the regime. Either answer is useful to you.
For the EU, the equivalent check is a CPNP notification per product. For the UK, a SCPN submission to the OPSS. Both are per-product and per-market, so ask for the count and, for the SKU you are buying, the entry itself.
4. Compare the sample against the production batch, not against the brochure
Ask for the sample’s batch record or at least the fill date, then ask how the production batch will be checked against it. A factory that runs a retained sample per batch can answer this in one sentence. One that cannot is relying on you not asking.
5. Get minimums and tier breaks in writing, per SKU
A single headline MOQ across a catalogue usually hides the fact that some SKUs carry a higher line minimum. Ask for the per-SKU figure at the quantity you intend to order, and ask what the next tier starts at. This is the number that decides your landed cost, more than the unit price does.
6. Pin down what the lead time is measured from
“25 days” means nothing until you know the trigger. Standard practice measures from artwork approval plus deposit receipt, not from enquiry. Ask for the trigger, then work backwards from your launch date — and add transit and customs to the plan, because production time is never the whole timeline.
7. Agree the Incoterm and the port before pricing
FOB, CFR, CIF and EXW produce four different totals for the same goods. FOB Guangzhou and FOB Ningbo are not the same number either. Fix the term and the port first, then compare quotes — otherwise you are comparing freight assumptions dressed up as product price.
8. Settle who owns the artwork and the formula
Artwork files, label plates and formula documents should be listed in the agreement with an owner. If the factory holds the plates, switching suppliers later means paying to remake them. If the factory holds the formula and the product is not exclusive, your differentiation is a label.
Red flags that repeat
A certificate number that cannot be matched to a scope. Exclusivity claimed verbally with no term. A sample that arrives faster than a formula could plausibly be developed. A quote that changes after the deposit. None of these are proof of bad faith on their own — together they are a pattern worth walking away from.
Where to check the figures on this site
The facility and export profile behind FATAZEN — site, headcount, port, certificate numbers and the notification counts on file — is published on our factory, with the fields that are missing from the source account stated as missing rather than estimated. Minimums and terms are on the wholesale FAQ. Brand-own production is described on private label.
Related: OEM vs ODM vs private label and what 500 pieces and 25 days actually mean.
Leave a Reply